KJWW provides acoustical consulting for problem-solving of sound, noise, and vibration issues.
Who We Are |
Firm Profile
  Leaders
  Awards & Rankings
What We Do |
  Architectural Lighting
  Construction Administration
  Electrical
  Mechanical
  Medical Equipment Solutions
  Structural
  Sustainability / LEED
  Systems Commissioning
  Technology
Our Expertise |
  Commercial / Corporate Office
  Community & Arts
  Government
  Healthcare
  Higher Education
  Industrial
  K-12 Education
  Laboratories
  Libraries
  Senior Living
  Sports & Recreation
  Recently Awarded |
  News & Events |
  Community Contributions |
  Careers |
  Contact Us |
 
 
 
 
  Project Details |  
 
 
Selected Image

Project Title : Chicago New 400,000 SF Federal FBI Office Building
Owner : U.S. General Services Administration
City & State : Chicago, IL
Square Footage : 850,000
Delivery Method : Design / Build
Completion Date : 04/15/2006
Disciplines Provided :

Construction Administration, Electrical, Fire Protection/Detection, Mechanical, System Commissioning

Prime : Lohan Anderson
Description :

KJWW Engineering was commissioned as engineer for design and construction of a new office building leased by the government to house field offices for the Federal Bureau of Investigation (FBI) in Chicago. The project was a developer-led, lease-buy-back delivery process. The Architect, KJWW, and Construction Manager were brought in at the beginning of the project and followed a design assist delivery with the major sub-contractors brought in during design.
 
Built on an 11-acre site at the edge of downtown Chicago, the new office building totals nearly 400,000 SF and includes an attached, one-story annex, a 2.5-story pre-cast parking garage, as well as two levels of parking under the office for more that 800 cars. Covering a gross area of 800,000 SF and with the 10-story office tower, the FBI’s seven Chicago locations, including the field office headquarters, are consolidated to one facility.
 
The building features state-of-the-art aesthetic design, and technology against bio-terrorism.
Challenges & Solutions |
  • Designed and built specifically for the FBI, this building had stringent security needs from the beginning. This meant learning new systems, designing for unique requirements and coordinating all operations on a very detailed level.
  • The absolute need for uninterrupted services required redunduncy of systems – including electrical power and HVAC, Under General Services Administration direction, a surplus GSA-owned generator from the 2002 Olympics in Utah was paralleled with another generator to serve the building’s emergency power needs.
  • Striving for sustainability, the engineers included high-efficiency HVAC equipment and lighting systems and occupancy sensors. Generators were located interior to the building ito minimize noise at the property line. The façade is a combination of 60% pre-cast concrete and high-performance, low-emissive glass for energy efficiency.
  • This design-build project, completed in 23 months, meant an aggressive schedule which required extensive coordination of services.

 
 
 Projects
Grand River Center
New 120,000 SF Exhibit and Conference Center with 600-ton Geothermal System | Dubuque, IA
[more]

 Announcements

KJWW Receives Top Engineering Excellence Award
[more]